GREENSTREET CENTER REDONDO

1/12

Location:  

Status:

Client:

Redondo Beach, CA

Built

GreenStreet Development

Three-building, 20,000 s.f. multi-tenant retail center featuring a raised concrete parking deck and a full-service carwash and detailing facility.

The center focuses on utilizing sustainable features in all aspects of the design and construction.

 

Click on image below to view an animation of the project design - 

 

© Copyright Bundy-Finkel Architects. 2020 All rights reserved.

  • YouTube
  • Facebook

1120 Bristol Street • Suite 120 • Costa Mesa • CA  92626 Ph.: (714) 850-7575 • Fx.: (714) 850-7676 • info@bundyfinkel.com